London · Est. 10+ years UK trade

Precision Drylining, Acoustic Solutions & Timber Framing

Internal packages delivered to millimetre tolerance — metal stud partitions, acoustic floors and ceilings, fire-rated linings and precise timber structures for London's most demanding fit-outs.

ScopePartitions · Linings · Acoustics · Framing
ResponseEstimates within 24 hours
CoverageGreater London & Home Counties

Capabilities

Four disciplines.
One standard.

Every package is set out, surveyed and signed off by the same hands — no layers of subcontract, no gaps between trades.

01

Drylining & Plasterboard

Taped, jointed and finished to Level 5 where required. Square, true and ready for decoration the day we hand over.

  • Dot & dab · MF ceilings
  • Level 4 / 5 finishing
  • Shadow gap & shadow bead
02

Partition Walls

Metal stud systems engineered for acoustics, fire performance and height — set out from grid, built plumb to survey.

  • 38–146 mm stud systems
  • Fire-rated to 120 min
  • Deflection heads & movement joints
03

Acoustic Solutions

Floors, ceilings and separating walls built to hit real dB targets — measured, not assumed, with documented build-ups.

  • Resilient bars & cradles
  • Acoustic floor build-ups
  • Party wall upgrades
04

Timber Framing

Precision carcassing for roofs, floors, studwork and bespoke joinery sub-structures. Cut lists, not guesswork.

  • Roof & floor structures
  • Studwork & boxing
  • Bespoke sub-frames

Live estimator

Know the number
before the site visit.

Select the package and the area. You get indicative man-days and a budgetary range based on current London labour and material rates. No email wall, no obligation.

  • Rates benchmarked Q4 2026, Greater London
  • Excludes VAT, scaffold, out-of-hours and structural design
  • Final figure confirmed after a free 30-minute survey
Package
Budget range £10,440 – £13,460 £58 / m²
Programme 17 days on site, working days

Indicative only. We reply within one working day with a fixed-price scope.

Selected work

Detail you can
put a level on.

Metal stud partition framing in a London apartment
Holland ParkPartitions & linings
Close-up of a taped and jointed plasterboard seam
KensingtonLevel 5 finishing
Acoustic floor build-up layers
MaryleboneAcoustic floor
Finished minimal interior with shadow gap detail
Canary WharfShadow gap detail

How we run it

Programme, then
precision.

  1. 01

    Survey & set-out

    Site measure, grid set-out and build-up selection documented before a single stud goes in.

  2. 02

    Fixed-price scope

    Line-item pricing by area and build-up, with programme and access assumptions stated.

  3. 03

    Install

    Directly employed crews. Daily progress photos, weekly programme update, clean site.

  4. 04

    Sign-off

    Snag-free handover with finish-level confirmation and as-built build-up record.

10+Years UK trade experience
120Minute fire-rated systems
54 dBAcoustic performance achieved
24hEstimate turnaround

Start a project

Send the drawings.
We'll do the rest.

Tell us the address, the package and the programme. If you have drawings or a schedule, we'll take them by email.

Coverage
Greater London & Home Counties
Company
Fix This Ltd · England & Wales